Fully labelled domestic consumer unit after EICR testing

CJA Electrical does EICR testing across Rochester and the wider Medway area: landlords ahead of a new tenancy or a 5-yearly recheck, homeowners buying or selling or just due an inspection, and anyone who’s noticed warm sockets, frequent tripping, or a burning smell they can’t explain. Rochester sits within the 0-minute working radius of our Rochester base, so site visits are tight to the diary and reports come back inside 48 hours.

What EICR actually is

“EICR” is short for Electrical Installation Condition Report, the formal documentation of a fixed-wiring inspection at a specific point in time. It tells you the condition of the installation today, lists anything that doesn’t meet current regulations, and gives the property owner a punchlist of what needs putting right. The report is what’s accepted as evidence of compliance: by Medway Council for landlords subject to the 2020 PRS regulations, by surveyors during a sale, by insurers at renewal, and by managing agents at change of tenancy. Reports formatted to the BS 7671 standard layout are recognised universally across the industry.

When you need EICR in Rochester

The triggers we see most often on Rochester EICR enquiries: landlord on the 5-yearly cycle (the largest single category); a tenancy changeover where the agent or landlord wants a fresh report; a pre-sale where the vendor wants documentation on the contract pack; a buyer who’s had the surveyor flag the electrics on a Level 2 or Level 3 report; an insurance renewal requiring current documentation; and homeowners who haven’t had the property tested for a decade or more. For older period property in Medway, sometimes it’s a fault that prompts the booking: a circuit that keeps tripping, a socket that’s stopped working, a burning smell from the consumer unit. We’ll often diagnose the immediate fault on the visit and roll into a full EICR while we’re there.

Smaller domestic consumer unit with each circuit clearly labelled
Smaller domestic consumer unit with each circuit clearly labelled

Standards and what compliance looks like

BS 7671:2018+A2:2022 is the technical reference behind every EICR. The standard sets out what gets inspected, what gets tested, what tolerances apply to each measurement, and how observations are coded. The 2022 amendment introduced changes around surge protection (now required on most domestic installations), arc fault detection in some circumstances, and updated requirements for outdoor and EV charging circuits. Older installations being inspected today are tested to current standards. That doesn’t mean every pre-2022 installation needs rewiring. Observations are coded based on whether the departure from current standards represents an actual safety issue. A consumer unit pre-dating the 2022 amendment that’s otherwise sound is typically a C3 (improvement recommended) rather than a C2 (potentially dangerous).

Fittings and where they go

What gets inspected: the consumer unit (the main fuse board) is opened up and inspected with the cover off. We check the main earth and bonding, the protective devices (MCBs, RCDs, RCBOs), the labelling, and the condition of the connections. From there we work through every accessible accessory in the property (sockets, switches, light fittings, immersion isolators, cooker outlets), checking each for damage, wear, and correct fitting. Cable routing is checked where it’s accessible. Loft spaces, under-stair cupboards, airing cupboards, and outbuildings get a visual where reachable. Buried cables behind plaster are not opened up, but the live testing picks up any major issues on those circuits via insulation resistance and earth fault loop measurements.

Multifunction tester measuring end-to-end resistance on a ring final circuit
Multifunction tester measuring end-to-end resistance on a ring final circuit

Testing schedule and remedials

Testing splits into dead testing (with the circuit isolated) and live testing (with the supply restored). Dead tests cover continuity of protective conductors, insulation resistance between live and earth, polarity, and ring final continuity on socket circuits. Live tests cover earth fault loop impedance, prospective fault current, and RCD operation times. Each circuit’s results are recorded individually on the schedule of test results that accompanies the certificate. For a typical three-bed property in Rochester the on-site time is half a day. Larger or older properties with more circuits can take a full day. The brief power-down for dead testing on each circuit is usually a few minutes per circuit, long enough to put kettles and computers off the boil, short enough that nothing in the fridge defrosts.

Why Rochester property owners book CJA Electrical

CJA Electrical is based in Rochester and covers EICR work across Medway from there. Rochester sits within the 0-minute working radius, close enough that scheduling is tight, return visits for remedial work are easy, and you’re dealing with someone who knows the local stock. We do mostly residential EICR plus increasingly commercial fixed-wire work as the client base has grown. Calibrated test equipment used on every job. Certificates supplied as a PDF inside 48 hours of testing. Remedial work quoted line-by-line against the observations so the price is clear and you can plan the budget, never bundled into the inspection fee.

How the work runs

Step one, quick chat about the property: how many bedrooms, rough age of the consumer unit, any known issues, any access constraints (tenanted property, occupied during works, working hours preferences). Most quotes are confirmed on that initial call as a fixed price, with larger or unusual properties going to a brief site visit before the quote firms up. Step two, testing visit. Half a day to a full day on site for most domestic property; longer for larger or multi-installation premises. Brief power-downs during dead testing flagged in advance. Step three, the report. PDF inside 48 hours, formatted to BS 7671 Appendix 6, with the schedule of test results, schedule of inspections, and observations all in the standard format insurers and agents expect to see.

What affects the price

EICR pricing is mostly driven by the size of the installation, circuit count more than floor area. A small flat with a single consumer unit and 6-8 circuits is at one end; a larger detached property with two consumer units, an outbuilding sub-board, and 20+ circuits is at the other. Most Rochester three-bed homes come in as a fixed price after a brief chat about the property. What’s included: the on-site inspection, the testing, the written report, and certificate delivery as a PDF. Remedial work, if anything is unsatisfactory, is quoted separately so you can shop around if you want and so the inspection price stays clean and predictable.

FAQs

What if my property has more than one consumer unit?

Common in larger Rochester properties: main board plus a garage or outbuilding sub-board, occasionally a separate board for a flat conversion or annexe. Each board is inspected separately and gets its own schedule of test results. The price reflects the additional testing time; we’ll confirm a fixed all-in number at quoting stage.

Can the report be supplied to my agent or council directly?

Yes. The PDF can go to you, your letting agent, your council, your insurer, or all of the above. Medway Council accepts the standard BS 7671 Appendix 6 format, as do all the major letting agents and managing agents we’ve worked with.

How long does an EICR take?

Half a day for a typical Rochester three-bed home. Smaller flats can be done in a couple of hours; larger properties with multiple consumer units or extensive outbuildings can take a full day. We give a realistic estimate at quoting stage based on circuit count and access.

Do I need to be present during the inspection?

For owner-occupied property, ideally yes. There’ll be brief power-downs as each circuit is tested, and someone needs to be aware in case sensitive equipment needs warning. For tenanted property, tenant access can be arranged via the letting agent or directly with the tenant; landlord attendance isn’t necessary.

What’s the difference between a Satisfactory and Unsatisfactory report?

A satisfactory report has no C1 (immediate danger) or C2 (potentially dangerous) observations. C3 observations (improvement recommended) on their own don’t fail the report. An unsatisfactory report means C1 or C2 observations are present and the installation needs remedial work to bring it back to compliance.

Can you do remedial work on the same visit?

Sometimes. Minor remedials (replacing a damaged socket face, tightening a loose connection, fitting a missing blanking plate) can be done on the inspection visit if time and parts allow. Larger remedial work (consumer unit replacement, recircuiting, additional RCD protection) is quoted separately and scheduled as a follow-up.

Will the inspection damage anything?

No. The tests are non-destructive. Insulation resistance and earth fault loop are low-current measurements that don’t stress the installation. Most of the on-site work is visual inspection plus brief electrical testing on each circuit. The only disruption is the short power-downs during dead testing.

Related services in Rochester

EICR in nearby towns

Frequently asked questions

What if my property has more than one consumer unit?

Common in larger Rochester properties: main board plus a garage or outbuilding sub-board, occasionally a separate board for a flat conversion or annexe. Each board is inspected separately and gets its own schedule of test results. The price reflects the additional testing time; we'll confirm a fixed all-in number at quoting stage.

Can the report be supplied to my agent or council directly?

Yes. The PDF can go to you, your letting agent, your council, your insurer, or all of the above. Medway Council accepts the standard BS 7671 Appendix 6 format, as do all the major letting agents and managing agents we've worked with.

How long does an EICR take?

Half a day for a typical Rochester three-bed home. Smaller flats can be done in a couple of hours; larger properties with multiple consumer units or extensive outbuildings can take a full day. We give a realistic estimate at quoting stage based on circuit count and access.

Do I need to be present during the inspection?

For owner-occupied property, ideally yes. There'll be brief power-downs as each circuit is tested, and someone needs to be aware in case sensitive equipment needs warning. For tenanted property, tenant access can be arranged via the letting agent or directly with the tenant; landlord attendance isn't necessary.

What's the difference between a Satisfactory and Unsatisfactory report?

A satisfactory report has no C1 (immediate danger) or C2 (potentially dangerous) observations. C3 observations (improvement recommended) on their own don't fail the report. An unsatisfactory report means C1 or C2 observations are present and the installation needs remedial work to bring it back to compliance.

Can you do remedial work on the same visit?

Sometimes. Minor remedials (replacing a damaged socket face, tightening a loose connection, fitting a missing blanking plate) can be done on the inspection visit if time and parts allow. Larger remedial work (consumer unit replacement, recircuiting, additional RCD protection) is quoted separately and scheduled as a follow-up.

Will the inspection damage anything?

No. The tests are non-destructive. Insulation resistance and earth fault loop are low-current measurements that don't stress the installation. Most of the on-site work is visual inspection plus brief electrical testing on each circuit. The only disruption is the short power-downs during dead testing.

Get a quote

Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.

EICR detail (helps with the quote)

Or skip the form: Office 01634 907123 Mobile 07598 216512 WhatsApp info@cjaelectrical.co.uk