Fully labelled domestic consumer unit after EICR testing

Periodic inspection and testing in Maidstone, what most people just call an EICR. The work covers a visual inspection of the consumer unit and accessible accessories, dead and live testing on every circuit, and a written report with each observation coded against BS 7671. Common drivers in Maidstone: a 5-yearly landlord check, a pre-sale or pre-purchase EICR, an insurer asking for current documentation, or a homeowner whose installation hasn’t been tested in a decade.

What EICR actually is

An EICR is a formal inspection and test of the fixed wiring in a property: the consumer unit, every circuit running off it, every accessible socket, switch, and light fitting. The output is a written report with observation codes against anything that’s not satisfactory: C1 for immediate danger, C2 for potentially dangerous (also a fail), C3 for improvement recommended, FI for further investigation required. A satisfactory report has no C1 or C2 observations. A property with C3 observations alone still passes. The report is what landlords need for the PRS regulations, what surveyors check on sale, and what insurers reference when validating a claim.

When you need EICR in Maidstone

Different reasons for different property types. Rented property in Maidstone runs on the 2020 PRS regulations: five years between inspections, plus a fresh report at the start of each new tenancy. The certificate is supplied to tenants and to the local authority on request. Owner-occupied property doesn’t have a statutory cycle. IET guidance is 10 years for domestic, but plenty of homeowners inspect more frequently, usually around major life events like buying, selling, or renovating. Insurance renewals also trigger it, especially on older properties or where there’s been a previous claim.

Modern RCBO consumer unit after a satisfactory EICR
Modern RCBO consumer unit after a satisfactory EICR

Standards and what compliance looks like

BS 7671:2018+A2:2022 is the technical reference behind every EICR. The standard sets out what gets inspected, what gets tested, what tolerances apply to each measurement, and how observations are coded. The 2022 amendment introduced changes around surge protection (now required on most domestic installations), arc fault detection in some circumstances, and updated requirements for outdoor and EV charging circuits. Older installations being inspected today are tested to current standards. That doesn’t mean every pre-2022 installation needs rewiring. Observations are coded based on whether the departure from current standards represents an actual safety issue. A consumer unit pre-dating the 2022 amendment that’s otherwise sound is typically a C3 (improvement recommended) rather than a C2 (potentially dangerous).

Fittings and where they go

Inspection scope is “what’s accessible without destruction”: we don’t lift floorboards or break into walls. The consumer unit comes off, every socket and switch plate is checked visually, every light fitting that’s reachable is inspected, and we go into lofts, cellars, outbuildings, and meter cupboards where they exist. For the hidden parts of the installation (buried cables, junctions inside walls), the live testing catches structural faults via insulation resistance (low values mean cable damage or moisture ingress) and earth fault loop impedance (high values mean a poor earth path). The combination of visual and test results is what builds the picture of installation condition.

Multifunction tester measuring end-to-end resistance on a ring final circuit
Multifunction tester measuring end-to-end resistance on a ring final circuit

Testing schedule and remedials

Testing splits into dead testing (with the circuit isolated) and live testing (with the supply restored). Dead tests cover continuity of protective conductors, insulation resistance between live and earth, polarity, and ring final continuity on socket circuits. Live tests cover earth fault loop impedance, prospective fault current, and RCD operation times. Each circuit’s results are recorded individually on the schedule of test results that accompanies the certificate. For a typical three-bed property in Maidstone the on-site time is half a day. Larger or older properties with more circuits can take a full day. The brief power-down for dead testing on each circuit is usually a few minutes per circuit, long enough to put kettles and computers off the boil, short enough that nothing in the fridge defrosts.

Why Maidstone property owners book CJA Electrical

CJA Electrical is based in Rochester and covers EICR work across Maidstone from there. Maidstone sits within the 30-minute working radius, close enough that scheduling is tight, return visits for remedial work are easy, and you’re dealing with someone who knows the local stock. We do mostly residential EICR plus increasingly commercial fixed-wire work as the client base has grown. Calibrated test equipment used on every job. Certificates supplied as a PDF inside 48 hours of testing. Remedial work quoted line-by-line against the observations so the price is clear and you can plan the budget, never bundled into the inspection fee.

How the work runs

Step one, quick chat about the property: how many bedrooms, rough age of the consumer unit, any known issues, any access constraints (tenanted property, occupied during works, working hours preferences). Most quotes are confirmed on that initial call as a fixed price, with larger or unusual properties going to a brief site visit before the quote firms up. Step two, testing visit. Half a day to a full day on site for most domestic property; longer for larger or multi-installation premises. Brief power-downs during dead testing flagged in advance. Step three, the report. PDF inside 48 hours, formatted to BS 7671 Appendix 6, with the schedule of test results, schedule of inspections, and observations all in the standard format insurers and agents expect to see.

What affects the price

EICR pricing is mostly driven by the size of the installation, circuit count more than floor area. A small flat with a single consumer unit and 6-8 circuits is at one end; a larger detached property with two consumer units, an outbuilding sub-board, and 20+ circuits is at the other. Most Maidstone three-bed homes come in as a fixed price after a brief chat about the property. What’s included: the on-site inspection, the testing, the written report, and certificate delivery as a PDF. Remedial work, if anything is unsatisfactory, is quoted separately so you can shop around if you want and so the inspection price stays clean and predictable.

FAQs

What if my property has more than one consumer unit?

Common in larger Maidstone properties: main board plus a garage or outbuilding sub-board, occasionally a separate board for a flat conversion or annexe. Each board is inspected separately and gets its own schedule of test results. The price reflects the additional testing time; we’ll confirm a fixed all-in number at quoting stage.

Can the report be supplied to my agent or council directly?

Yes. The PDF can go to you, your letting agent, your council, your insurer, or all of the above. Maidstone Borough Council accepts the standard BS 7671 Appendix 6 format, as do all the major letting agents and managing agents we’ve worked with.

How long does an EICR take?

Half a day for a typical Maidstone three-bed home. Smaller flats can be done in a couple of hours; larger properties with multiple consumer units or extensive outbuildings can take a full day. We give a realistic estimate at quoting stage based on circuit count and access.

Do I need to be present during the inspection?

For owner-occupied property, ideally yes. There’ll be brief power-downs as each circuit is tested, and someone needs to be aware in case sensitive equipment needs warning. For tenanted property, tenant access can be arranged via the letting agent or directly with the tenant; landlord attendance isn’t necessary.

What’s the difference between a Satisfactory and Unsatisfactory report?

A satisfactory report has no C1 (immediate danger) or C2 (potentially dangerous) observations. C3 observations (improvement recommended) on their own don’t fail the report. An unsatisfactory report means C1 or C2 observations are present and the installation needs remedial work to bring it back to compliance.

Related services in Maidstone

EICR in nearby towns

Frequently asked questions

What if my property has more than one consumer unit?

Common in larger Maidstone properties: main board plus a garage or outbuilding sub-board, occasionally a separate board for a flat conversion or annexe. Each board is inspected separately and gets its own schedule of test results. The price reflects the additional testing time; we'll confirm a fixed all-in number at quoting stage.

Can the report be supplied to my agent or council directly?

Yes. The PDF can go to you, your letting agent, your council, your insurer, or all of the above. Maidstone Borough Council accepts the standard BS 7671 Appendix 6 format, as do all the major letting agents and managing agents we've worked with.

How long does an EICR take?

Half a day for a typical Maidstone three-bed home. Smaller flats can be done in a couple of hours; larger properties with multiple consumer units or extensive outbuildings can take a full day. We give a realistic estimate at quoting stage based on circuit count and access.

Do I need to be present during the inspection?

For owner-occupied property, ideally yes. There'll be brief power-downs as each circuit is tested, and someone needs to be aware in case sensitive equipment needs warning. For tenanted property, tenant access can be arranged via the letting agent or directly with the tenant; landlord attendance isn't necessary.

What's the difference between a Satisfactory and Unsatisfactory report?

A satisfactory report has no C1 (immediate danger) or C2 (potentially dangerous) observations. C3 observations (improvement recommended) on their own don't fail the report. An unsatisfactory report means C1 or C2 observations are present and the installation needs remedial work to bring it back to compliance.

Get a quote

Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.

EICR detail (helps with the quote)

Or skip the form: Office 01634 907123 Mobile 07598 216512 WhatsApp info@cjaelectrical.co.uk